JZHC blower skid packages help you operate cleaner and more economically, with minimized installation costs and start-up time. Our blower systems maximize waste gas collection by pulling waste gas from the landfill through a series of wells, then safely transporting it to the Zink biogas flare, a gas facility or other end-use location. Our pre-packaged blower skids offer skid capacities up to 12,000 SCFM for multiple flare systems and come pre-piped, pre-wired and pre-tested.
Contact Us To Learn More.